This is a partial summary of our clients and past projects that include underground utilities, sanitary sewer, watershed relief, force mains and lift station upgrades, WWTF and grinder pump projects.
Location: 2320 Hyde Park Rd., Jefferson City, MO
Description: Construction of approximately 22,000 linear feet of 24" diameter forcemain sewer, including directional bores under the Missouri River and Grey's Creek crossings. Bores installed at railroad and river levees. This project was funded by DNR.
Location: Columbia, MO
Description: Construction of 5,555 linear feet of sanitary sewer, 28 manholes, driveway and street restoration, sludge removal and appurtenances.
Location: Sedalia, MO
Description: Construction of 16,517 linear feet of 36", 30", 18", 12" and 8" diameter sanitary sewer main, 66 manholes, road bores, concrete encasement, concrete and asphalt street replacement, sidewalk replacement and appurtenances.
Location: 28982 Harbor Rd., Gravois Mills, MO
Description: Construction of 40,000 linear feet of sanitary sewer, grinder pump stations, street replacement and service line hook-ups. This project was funded by DNR and CDBG. This project presented a difficult challenge installing the grinder pump stations because of limited access and steep grades.
Location: Columbia, MO
Description: Construction of 3,580 linear feet of 30" diameter sanitary sewer, 13 manholes, abandonment of existing sewer, pavement patching/overlay and appurtenances.
Location: Boone County Regional Sewer District
1314 N. 7th St., Columbia, MO
Description: Construction of approximately 40,000 linear feet of 1.5" to 4" sewer line, 88 grinder pump stations, electrical and site work restoration with seeding. This project was funded by DNR.
Location: Columbia, MO
Description: Construction of 1,414 linear feet of sanitary sewer, 7 manholes, 636 linear feet of bores, lagoon closure and apurtenances.
Location: Columbia, MO
Description: Part 1 included construction of 5,950 linear feet of 42", 36", 30", 21", 18", 15", 12" and 8" diameter sanitary sewer main, 38 manholes, grout abandonment of existing sewer lines, road bores, concrete & asphalt street replacement and appurtenances. Part II included construction of 670 linear feet of 18" and 12" diameter sanitary sewer, 6 manholes, traffic control, concrete sidewalk replacement, asphalt street replacement and appurtenances.
Location: Deepwater, MO
Description: Installation of 9,604 linear feet of sanitary sewer, 36 manholes, asphalt and concrete road replacement, lift station rehabilitation, trash basket installation and appurtenances.
Location: University of Missouri-Columbia
Description: Construction of 792 linear feet of 15" diameter RCP storm sewer, 4 inlet structures, asphalt and concrete pavement replacement, curb and gutter replacement, and waterline replacement.
Location: Columbia, MO
Description: Installation of 30,224 linear feet of 36" and 24" diameter sanitary sewer, 81 manhole structures, and 18,000 cubic yards of rock excavation with lines as deep as 29'. The project included Wetlands Area construction.
Location: Columbia, MO
Description: Installation of 26,746 linear feet of 16" dip waterline, 2,056 linear feet of 12" and 30" waterline, fire hydrants and appurtenances.